Active Filters

  • (-) Keywords = full-scale experiments
  • (-) Keywords ≠ solid-flux method
Search Results 1 - 5 of 5
  • RSS Feed
Select Page
The EAWAG Bio-P module for activated sludge model No. 3
Siegrist, H., Rieger, L., Koch, G., Kühni, M., & Gujer, W. (2002). The EAWAG Bio-P module for activated sludge model No. 3. Water Science and Technology, 45(6), 61-76. https://doi.org/10.2166/wst.2002.0094
Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part I: prediction of nitrogen removal and sludge production
Koch, G., Kühni, M., & Siegrist, H. (2001). Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part I: prediction of nitrogen removal and sludge production. Water Research, 35(9), 2235-2245. https://doi.org/10.1016/S0043-1354(00)00514-5
Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part II: prediction of phosphorus removal
Koch, G., Kühni, M., Rieger, L., & Siegrist, H. (2001). Calibration and validation of an ASM3-based steady-state model for activated sludge systems—part II: prediction of phosphorus removal. Water Research, 35(9), 2246-2255. https://doi.org/10.1016/S0043-1354(00)00515-7
The EAWAG Bio-P module for activated sludge model No. 3
Rieger, L., Koch, G., Kühni, M., Gujer, W., & Siegrist, H. (2001). The EAWAG Bio-P module for activated sludge model No. 3. Water Research, 35(16), 3887-3903. https://doi.org/10.1016/S0043-1354(01)00110-5
Calibration and validation of activated sludge model No. 3 for Swiss municipal wastewater
Koch, G., Kühni, M., Gujer, W., & Siegrist, H. (2000). Calibration and validation of activated sludge model No. 3 for Swiss municipal wastewater. Water Research, 34(14), 3580-3590. https://doi.org/10.1016/S0043-1354(00)00105-6